Reservoir · Main bathroom

Warm minimal main bathroom

Warm oak vanity, honed travertine floor, brushed brass tapware.

Scope
Full strip-out and rebuild
On-site
3 weeks, 4 days
Completed
Aug 2025
Investment
From $24,950
Warm minimal main bathroom — completed bathroom in Reservoir
Project overview

Original 1960s brick-veneer bathroom stripped to studs and slab, rebuilt as a warm minimal main bathroom. Honed travertine floor, oak floating vanity and brushed brass PVD tapware. Held to a fixed written price and finished four days ahead of the contracted date.

Before photos for this project are available on request — we don't publish generic stock images or AI renders as "before" shots.

Scope of work

What was actually built.

  • Full demolition and rubbish removal
  • Copper plumbing rough-in with Certificate of Compliance
  • Compressed fibre-cement sheeting to timber subfloor
  • Screed to 1:80 fall, primer and two-coat AS3740-2021 membrane
  • Full wall and floor tiling with epoxy grout to wet zones
  • Custom oak floating vanity with stone top and undermount basin
  • Semi-frameless 10mm shower screen
  • Detailed clean and formal handover with warranty pack
Products used

Every fixture, by brand and model.

Floor tile
Signorino
Honed travertine 600×300
Wall tile
Academy Tiles
Zellige-look 100×100
Tapware
Meir
Round PVD Tiger Bronze mixer + rail shower
Vanity
Custom (Vision Line joinery)
Oak veneer, soft-close
Basin
Kaskade
Sabbia undermount
Toilet
Caroma
Urbane II wall-faced
Waterproofing
Ardex
WPM 002
Challenges solved on site

Where trade experience actually mattered.

Problem

Original 1960s timber floor had a 12mm dip beneath the shower.

Solution

Packed and re-sheeted with 15mm compressed FC, then screeded to a true 1:80 fall before waterproofing.

Problem

Wall studs were undersized for the wall-hung vanity and toilet.

Solution

Installed hardwood noggings between studs at exact mounting heights, structurally rated for 150kg point load.

Services demonstrated

This project showcases:

Local area

More about renovating in Reservoir

Reservoir is one of the most active bathroom renovation suburbs in Melbourne's north. Housing here ranges from Californian bungalows on Broadway and Cheddar Road through post-war weatherboards along Cheddar and Spring Streets to the newer townhouse developments closer to Regent Station. Most bathrooms we replace in Reservoir were last renovated in the 1970s or 1990s — undersized, poorly waterproofed, and built on timber floors that need proper structural attention before tiling starts.

Bathroom renovations in Reservoir
Request a similar renovation

Book a free on-site measure.

Tell us your suburb and rough scope. We'll come out, measure, photograph the substrate and issue a fixed-price written quote — usually within five working days.

Get Your Bathroom Renovation Quote

Tell us a few details and we'll let you know which package suits your bathroom.

Upload Photos (optional)

No spam. No sales pressure. Just a clear quote from a Melbourne bathroom renovation team.